Concrete setting-out levels worksheet

Use your datum, supplied plane and point coordinates. Keep target RLs, staff readings and measured check errors on one revision-linked sheet.

This worksheet works out target levels and staff readings from the datum and plane you supply. Designing falls, checking drainage and approving the work stay with the people responsible for the job.

Calculate first; document second

The example fills the form with illustrative values you can edit. It is not a site specification. For your job, enter every value yourself, including zeros.

Benchmark and instrument setup

HPC = benchmark RL + backsight
Target staff = HPC − target RL

One supplied target plane

z = z0 + gx(x − x0) + gy(y − y0)

x, y and RL are in metres; gradients are in m/m. A positive gradient means RL rises. Enter every value exactly as given, including zeros.

Setting-out points

Add 1–200 points, each with its own ID. Leave the observed staff blank if you have not taken a reading; a blank is never treated as zero. Targets are calculated only at the points you enter.

Record details (needed to print, export or save)

After the preview, enter the real project, drawing, specification and datum references. Validation checks that the record is complete and the arithmetic is consistent; it cannot confirm that your source is genuine or suitable.

Project, drawing and datum

Copy the supplied plane and tolerance from the referenced revision. This tool does not verify that document or approve your geometry.

Loading the example does not calculate it. Press Calculate provisional preview when you are ready.

Levels and measured checks

No current calculation. Enter a complete supplied-plane record.

Any edit clears the current result, so calculate again. The tolerance check compares numbers only; approving the surface and drainage stays with the person responsible for the work.

Import a record or restore saved inputs

Import a JSON file saved from this worksheet (up to 1 MiB and 200 points). Your inputs are checked and every result is recalculated from your exact entries. Nothing is sent to a server; keep exported files as your record.

Nothing is saved unless you tick this box. Only your checked inputs are kept in this browser, never the results. After restoring, calculate again. Unticking the box or pressing Forget local draft removes the saved inputs where the browser allows. No analytics, cookies or accounts.

Local remembering is off. Export a file for a durable record.

Method, signs and fixed worked example

From supplied plane to staff reading

Target RL = z0 + gx(x − x0) + gy(y − y0)
HPC = benchmark RL + backsight
Target staff = HPC − target RL
Measured RL = HPC − observed staff
Staff error mm = 1000 × (observed − target staff)
Level error mm = 1000 × (measured RL − target RL)

Positive staff error means the surface is low; positive level error means it is high. Their signs are opposite. The size of each error, ignoring its sign, is compared with your specified tolerance in mm. A reading exactly at the tolerance limit counts as within it. Signs and the tolerance check use your exact entries, never rounded figures.

Fixed worked example

BM 100.5 m + backsight 1.25 m → HPC 101.75 m. At target RL 100.38 m → target staff 1.37 m. Observed staff 1.38 m → staff error +10 mm; measured RL 100.37 m → level error −10 mm. With a supplied tolerance of 10 mm, this reading sits exactly on the limit and counts as within it. That is a numerical check, not approval of the surface.

Printable blank setting-out worksheet

Blank setting-out worksheet

Printed UTC: ____________________ · Method version 1.0.0

Project: ____________________ Drawing: ____________________
Specification: ____________________ Revision: ____________________
Datum: ____________________ Source date: ____________________

BM RL m: ______ Backsight m: ______ HPC m: ______ Tolerance mm: ______
Plane x0/y0/z0 m: ____________________ gx/gy m/m: ____________________

Points and targets
IDx/y mTarget RL mTarget staff mObserved staff mActual/check
____________________________________
____________________________________
____________________________________

Staff error mm (+ means low): ____________________
Level error mm (+ means high): ____________________
Tolerance check (numbers only) / checked by: ____________________

From https://www.universal-concrete.com/tools/concrete-setting-out-levels/ · Blank worksheet for manual use. It uses one supplied plane and is not a scale drawing or approved geometry.

HPC means height of plane of collimation: the instrument reference height, not the surface RL. Use these figures with the pouring and finishing checklist; they do not approve the placing method or curing plan.

Terms used in this calculator
Setting-out levels
Target reduced levels and staff readings calculated from a supplied datum and one supplied plane.
Datum
The reference basis from which the supplied levels are recorded; its identification stays with the drawing revision.
Reduced level
An elevation relative to the adopted datum, recorded in metres in these worksheets.
Backsight
The staff reading on the benchmark used with its reduced level to calculate collimation height.
Height of plane of collimation
Benchmark reduced level plus backsight; the reference height used to obtain target staff readings.
Staff reading
A target or observed reading; measured reduced level equals collimation height minus observed staff.
Supplied target plane
One plane given by origin elevation and two gradients from the drawing or specification; the tool does not design it.
Level and staff-reading error
Signed differences between measured and target levels, or observed and target staff readings; the two signs are opposite.